Consultation meeting announcement

Milestone / GCP monthly consultation on Milton Road Improvements

The next meeting has been confirmed as on Monday 6th March. Again from 11am to 12.30pm at Milton Library meeting room

———————————————————————————————————-

Here is a summary of the first meeting, held on Friday 3rd February from 11am to 12.30pm.

Last minute reschedule

Present up to 10 local residents

3 members of Milestone contractors include Jake and Naomi

These sessions were planned for their site at Woodhead Drive but they ended up restricted on office space so last minute changes to Library and on the Friday 3rd.

Tom Porter (who took over as Project Manager from Paul van de Bulk) from GCP couldn’t make!!!

So lots of questions for Tom next time.

This meeting was advertised as a drop in session but more of a discussion round a table, so worth being there from the start really.

More regular updates of work being done and closures etc were asked for on public noticeboards – they promised to get back on this to help with finding suitable sites.

The issue was raised about the closure of the pedestrian/cycle route through Oak Tree Ave – they will try and improve the signage at the Elizabeth Way pedestrian crossing.

They were also asked if they could have some “live” information about the buses -it seems unlikely this will happen, but the timetable is still “live” on the old Union Lane bus stop – though it was hard to get across the road to read it!

They have been informed that a lot of people want the modal filter on Union Lane to remain.  They already knew this! 

They were asked about the future for Arbury Road – it will have a similar system as Union Lane when the work is done on the northern side of Milton Road. Official diversion will be via Kings Hedges Road – but there will be nothing to stop locals using Hurst Park Ave rat run, as at present.

Pothole filling still responsibility of highways dept. Even within roadworks like outside library. Milestone say they are reporting them daily too. There has been filling in subsequently but poor standard. 

Much discussion about the status of GCP and its undemocratic set up.

Also about who is liable when accidents occur, as there have been, particularly cycling related.

Your experience of the temporary road closure

Results of Union Lane survey

In January, we surveyed residents of Union Lane. We asked you about your experience of having the road closed to through traffic due to the Milton Road improvement works. We distributed 100 survey forms to residents whose front doors open directly on to Union Lane. We got 21 replies.
Here Is what you told us.

The results show consistently divided opinion about whether specific conditions imposed by the closure have been an improvement or not. Despite this, two thirds of you would like to see the closure made permanent.

Almost all of you (6 out of 7) think that Union Lane has been quieter than usual and more pleasant to live on during the road closure. Nearly two-thirds you of told us that traffic using Union Lane has been going more slowly than usual. Less than a third you said that it hadn’t. Almost all of you suggested that the number of cars and other vehicles using Union Lane has been reduced during the construction work.

Almost all of you reported that the road closure has made it more difficult to access your homes on foot. Three quarters of you didn’t know whether it has made it more difficult for those using mobility scooters, with none one suggesting that it has. Almost all of you (again out of 7) said that the road closure has not made it more difficult access your home by bicycle. Nearly two thirds of you reported that it has made it more difficult to access your home by car. But nearly a third said it hasn’t. More than a third of you said that the road closure hasn’t made it more difficult for delivery vehicles to access your homes. But a third said it has. The rest of you don’t know whether it has or not.

Nearly three quarters of you said that you have found using Union Lane safer during the closure for construction work. Only two of you reported that it was more dangerous. Almost a fifth of you don’t know. Almost two-thirds of you reported that you have found it easier and more pleasant to walk and cycle to Milton and Chesterton Roads. Only a minority reported that it isn’t. You were almost equally divided about whether arrangements put in place for crossing Milton Road have been satisfactory. Just over half of you suggested that they have: slightly less than half that they haven’t.

About three-fifths of you suggested that the modal filter closing Union Lane has had an effect on your regular car journeys, making them longer: just under two-fifths reported that it hasn’t. But over two-thirds of you told us you have been able to find a reasonable alternative route for you regular car journey while just under a third said you haven’t.

Just over half of you reported that you haven’t walked or used a bike more frequently while the modal filter has been in place, with just over a third saying you have. Just over three-fifths of you judged that the modal filter has had a positive effect on parking on Union Lane but a third of you disagree.

Despite the differences reported above, two thirds of you would like the modal filter at the Milton Road end of Union Lane to become permanent. A third of you wouldn’t.
If you feel strongly about whether the modal filter should stay or not, let your local councillors know,
see
https://arera.org.uk/local-democracy/      for contact details

If you want to contact us, go to https://arera.org.uk/contact-arera/

Update about timing of Milestone/GCP meetings for local residents to raise issues about  the Milton Road improvement works

The GCP and Milestone have changed the date for their Drop-in meetings for local residents.

These will now be held on the first Monday of the month 11-12.30 at Milton Road Library.  

These meeting are an an easy opportunity for you to raise any issue you have about the Milton Road improvement works.

At the last meeting, Milestone agreed that they would:

  • provide some noticeboards to keep people informed about bus stops, road closures etc
  • improve the signage for pedestrians and cyclists on the Elizabeth Way access to Oak Tree Avenue

While vehicle access from Milton Road is limited by their works, please note that there is a passageway between Union Lane and Oak Tree Ave which joins the latter at the right-angle corner and enables safe pedestrian access to Milton Road via a safe crossing point.

The Greater Cambridge Partnership has just released a set of FAQs about the residents’ parking schemes that it is introducing.

The FAQs appear to be generic.

And so it is likely that the answers given will also apply to us if/when we get included in the Hurst Park Estate residents’ parking scheme.

The questions are worth reading in full.

You can find them at: https://consultcambs.uk.engagementhq.com/gcp-york-area-parking/widgets/61706/faqs#question16711

Some are particularly pertinent to us on Arbury Road East – for instance, about on pavement parking and front garden parking if you don’t already have a dropped kerb.

You can see these below, and visit link above for all.

Please let us know if you have any issues, comments or queries that any of this raises for you.

Ian Cooper

Secretary, ARERA

What about parking on the footway alongside the road?

The Council receives a lot of complaints about parked cars blocking footways for pedestrians, pushchairs and wheelchairs. We cannot introduce a parking scheme that allows parking on the footway and forces vulnerable road users to walk in the road. The exception to this is in streets where such an arrangement is already in place and spaces have been formally marked as such.

Will we have to have signs and road markings in the street?

It is essential that drivers are aware of where they can and cannot park. Generally speaking, where parking is permitted, the areas will be marked out as white boxes with upright signs alongside. Where parking is not allowed, yellow lines are used. In some schemes it is not practical to mark out bays on the road. In such areas, there will be zone entry signs and repeater signs but no bay markings. These schemes are known as Permit Parking Areas (PPA).

How will the scheme affect the use of my private driveway?

You do not need a permit to park on your driveway or any other private areas of land.

If you have a constructed access with dropped kerbs, we will not mark a bay across it.

However, if you use your garden to park on and do not have dropped kerbs this is an unauthorised vehicular access, and we may allow parking across your frontage. In this situation, you may wish to consider applying for dropped kerbs. You can obtain more information here: www.cambridgeshire.gov.uk and enter Dropped Kerbs in the search bar.

Announcement of Drop-in Sessions with Milestone about Milton Road Improvement Works

Are you interested in questioning/talking to Milestone, the contractors, about the Milton Road Improvement works?

They have just posted this announcement of the launch of their drop-in sessions at Milton Road library, see below.


Commencing public drop-in sessions at Milton Road library

We are pleased to announce the start of our public drop-in sessions. These are scheduled for the first Friday of every month from 11:00-12:30 in meeting room 2 at Milton Road library.

There will be no need to pre-book a time slot, but please be aware you may have to wait if the team are already discussing concerns or questions with another member of the public.

We will review the frequency of these meetings as we continue the project and may amend them if needed.

If you have any concerns during the construction, please do get in touch with Milestone’s project team on MiltonRoad@milestoneinfra.co.uk or telephone the 24 hour contact centre on 0800 023 4762